DPMS

verifiedInfraTech

psychologyMy Role in the Product

The goal was simple to make DPMS the command engine of project execution, digitising every project pillar from planning to execution to billing, eliminating manual processes and closing any scope for manipulation in records. Designed AI-powered agents Site Entry Validation.

warningProblem & Challenges

priority_high

Field Entry Edge Cases : Countless field operation variations made it difficult to design a single, standardised site entry form that worked across scenarios

priority_high

Unstructured Role Framework : No defined roles, site allocations, or record-keeping structure, leaving accountability unclear across the field workforce.

priority_high

Attendance-Entry Disconnect : Attendance was marked independently through the HRMS app, creating cases where attendance was logged with no corresponding site visit recorded that day.

priority_high

No Photo Evidencing : Site entries had no photographic proof, leaving field visits unverifiable.

priority_high

Unverified KM Claims : Kilometers travelled weren’t captured, so expense bills and Kilometers vouchers had no way to be validated.

architectureStrategic Execution

1Dynamic Field Entry Forms

Designed flexible, condition-based entry forms that adapted to different field scenarios instead of forcing a rigid one-size-fits-all format

2Role-Based Site Structuring

Introduced defined roles, site allocations, and structured record-keeping to bring clarity and accountability to field operations

3Unified Attendance-Site Linkage

Integrated site entry directly with HRMS platform for attendance, so an engineer’s presence at a site automatically reflected in attendance records.

4Photo-Based Evidencing

Built mandatory photo capture into the site entry workflow, making every visit verifiable with visual proof

5KM Tracking for Expense Verification

Using Google Destination APIs and defined site entry points, kilometers were digitally captured, eliminating manual KM entry and enabling accurate, tamper-proof verification of travel expense claims.

workspace_premiumKey Outcomes

75%
reduction in TAT for site verification process (4 days → 1 day)
100%
digital capture across the entire project lifecycle
AI AGENT
deployed for automated site verification
Contact Mearrow_forward